Steel Warehouse Directly Factory Price
1.Main steel structure: welded H steel;
2.Purlin:cold-rolled C section steel;
3.Roof panel: color steel sheet or sandwich panel;
4.Wall: brick below 1.2meter, color steel sheet or sandwich panel above 1.2m;
5.Tie bar: round tube;
6.Brace: round steel;
7.Lateral and column bracing: round steel;
8.Knee brace: hot- rolled angle steel;
9.Trims,flashing: color steel sheet;
10.Gutter:color steel sheet;
11.Downpipe: UPVC;
12:Door: sandwich panel sliding door or rolling door;
13: Window: PVC window or aluminum alloy window
Color steel sandwich panel not only easy installation .high strength .protuction environment but also defensive fire and heat preservation.Beantiful shape and have diffferent colors we can choice.The real high-quality and low-cost.
Light steel structure constitutes the framework system of the portable building, which makes it safe and reliable. It satisfies the criterion demand of the building design
1.Common type of the industrial building? Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request. |
2.What’s the quality grade of the steel structure components? Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. |
3.How about the delivery time? Reply: Usually,within 45-60 days after the order /confirm/ied, also depends on the fabrication quantity. |
4.How about the derust grade? Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure. |
5.What kind panel used for the roof and wall? Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU. |
6.How to install it? Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed. |
7.Maintenance: Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time. |