Easy install sandwich panel outside corrugated steel sheet panel
Material: | Color coated, galvanized, hot galvanized, and stainless steel panel |
Steel panel thickness: | 0.2--0.8mm for external/ internal steel panel |
Width: | Wall: 950mm, 1000mm,1150mm,1200mm, Roofing: 950mm, 960mm, 970mm, |
Core material density: | Rock wool/glass fiber :100/160kg/SQM EPS: 8-25kg/SQM |
Color: | As required |
Thickness: | 50mm, 75mm, 100mm, 150mm, 200mm, 250mm |
Side steel strip: | Have or not/ as required. (Normally we use galvanized plate on thickness of 0.5mm--1.0mm) |
Length: | Unlimited, ≤12m due to transportation |
Advantage: | Waterproof, fire-resistance, noise-absorbing, insulated and convenient for construction. |
Application: | It is widely used as roofing and wall material for steel structure plant. Such as steel structure, workshop, warehouse, prefab house. |
1.Common type of the industrial building? Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request. |
2.What’s the quality grade of the steel structure components? Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. |
3.How about the delivery time? Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication quantity. |
4.How about the derust grade? Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure. |
5.What kind panel used for the roof and wall? Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU. |
6.How to install it? Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed. |
7.Maintenance: Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time. |