banner
Product
  • Phone

    0086-532-13012529671

  • Address

    Shangma Ind. Area, Chengyang District, Qingdao, Shandong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts
Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses, US $ 23 - 70 / Square Meter, China, ALF steel warehouse, steel warehouse.Source from Qingdao Aolifeng Building Materials Manufacture Co., Ltd. on Waimaotong.com.

Description

Overview
Quick Details
Place of Origin:
China
Brand Name:
ALF steel warehouse
Model Number:
steel warehouse
item:
modern easy assemble warehouse in china
Quality Certificatation:
ISO9001:2008/SGS/BV/CE
material:
Q345 OR Q235
Design:
our engineer can design drawings as your requirement
Columns and Beams:
H section, painting or galvanized
Purline:
cold rolled C/Z Galvanized Steel
wall and roof panel:
corrugated steel sheet and EPS/Rock wool/Glass wool/PU sandwich panel
Color:
RAL customized
Door:
sliding door, rolling daor, higned door
Window:
plastic steel or aluminum alloy window
Supply Ability
Supply Ability:
3000 Ton/Tons per Month warehouse in china
Packaging & Delivery
Packaging Details
Portal bolted connection famous steel structure buildings
are standard package, load in bulk or 20GP,40GP,40HQ,40OT
Port
Qingdao port

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses 

 

 

 

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

 

1. Location (where will be built? ) _____country, area

2. Size: Length*width*height _____mm*_____mm*_____mm

3. Live load on roof(KN/M2), live load on second floor(KN/M2) if have

3. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4. Snow load (max. Snow height) _____kn/m2, _____mm

5. Anti-earthquake _____level

6. Brickwall needed or not If yes, 1.2m high or 1.5m high

7. Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.

8. Door quantity & size _____units, _____(width)mm*_____(height)mm

9. Window quanity & size _____units, _____(width)mm*_____(height)mm

10. Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m

11. Skylight belt, ventilator and any other accessories if needed.

 

 

 

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

 

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

 

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

 

1.Our company is established in 2000 .It is a professional  manufacturer and exporter of steel products. From the establishment of the company ,we are emphasising on the quality.as it we have got ISO99001:2008 certification ect..and plus our own experienced design department ,as result our products are sold to Europe,Japan,South Africa,Vietnam,Russia and so on.We can undertaken more than 100 steel structure projects indoor and outside , and the pass rate is 99 percent.

2. Finally,we have a group of professional engineers and  can provide the service of installation supervisin and training by extra.In the fierce market competition, Qingdao aolifeng metal materials Co,.LTD .will uphold the operating philosophy of Creating Value for Customers to win our clients and market. We will make the demand of customers and market as our developing motivity, and strive for exploiting larger market and provide the best and most comprehensive for the customers.

3.It is only a small part of our product list maybe you will be interested in some of price the items,and if you need other product .Please kindly advise me the detail of them.We will quote our best price as soon as posible . If necessary we can also send the sample to you ,If you have any requirement .Please not hesitate to contact me .

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

Durable Custom Steel Built Fabricated Sectional Structures Buildings Prefabricated Steel Frame Fabricated Warehouses

 

 

1.Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other

types also could be designed and manufacturer as per clients’ request.

2.What’s the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 

3.How about the delivery time?

Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication

quantity.

4.How about the derust grade?

Reply: Ball blasting Sa 2.5 on main steel structure ; 

      manual derust St2.0 on secondary steel structure.

5.What kind panel used for the roof and wall? 

Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel

performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,

glass wool and PU.

6.How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual

which could help you to erect and install the building step by step. We also could send the

engineer to your local to help you if needed.

7.Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months.

So the surface will stay more time.